Basin A Neck groundwater intercept and treatment system
This project called for the design and construction of an alluvial (or shallow) groundwater intercept and treatment system in the Basin A Neck area.
As with the Basin F Neck IRA, this system treats groundwater more efficiently by capturing it closer to the source.
Site preparation for Basin A Neck began in November 1989 and became fully operational in July 1990.
The system treated approximately 7.3 million gallons in 1995.
Courtesy of The EPA
Looking for information about Offpost Intercept and Treatment system?