Complete Survey Before Demolition

A survey to identify the presence and location of asbestos containing materials must be completed prior to demolition. In the absence of a survey or if one cannot safely be performed, all surfacing materials and thermal system insulation in building constructed no later than 1980 must be presumed to contain asbestos (demolition of surfacing materials and thermal system insulation presumed to be asbestos containing is Class I asbestos work).

Courtesy of WISHA

Mesothelioma Mesothelioma Home Page
head Mesothelioma: An Overview
kleio The Clock Is Ticking
asbestos Our Toughest Cases
head Diagnosis
treatment Symptoms, Stages, Treatment
kleio Latest News
New York Numbers
Asbestos
Real Stories


Mesothelioma
Types of Asbestos Cancer
Asbestos Removal
asbestos removal dangers
Asbestos Removal Process
Asbestos Disposal
IN THIS SECTION
Basic Requirements
Is it safe to demolish?
Primary Verification
Scheduling Demolition
WISHA Procedures
Demolition Survey
Equipment

Mesothelioma Lawyer

Asbestos Lawyer

Mesothelioma Attorney

Asbestos Attorney

For legal help anywhere in the U.S. call:

1 - 800 - 476 - 6070

Prior results do not guarantee a similar outcome.

ATTORNEY ADVERTISING

see also:

Basic Requirements Read about the safety requirements of asbestos & hazardous materials
Demolition requirements re: asbestos and other hazardous materials

Primary Verification Primary verification required in an asbestos demolition project
Asbestos demolition project:Primary Verification is Required

Demolition of Buildings Built With Asbestos NY lawyers: Demolition of buildings with asbestos-containing materials
Read about safe demolition of buildings/ asbestos-containing materials