HOME STORY OF OUR FIRM SEARCH
ASBESTOS DRUGS POLLUTANTS ACCIDENTS MALPRACTICE

OSHA: Materials and Equipment Necessary for Asbestos Removal

Although individual asbestos removal projects vary in terms of the equipment required to accomplish the removal of the materials, some equipment and materials are common to most asbestos removal operations

.

Plastic sheeting used to protect horizontal surfaces, seal HVAC openings or to seal vertical openings and ceilings should have a minimum thickness of 6 mils.

Tape or other adhesive used to attach plastic sheeting should be of sufficient adhesive strength to support the weight of the material plus all stresses encountered during the entire duration of the project without becoming detached from the surface.

Courtesy of OSHA
Mesothelioma Mesothelioma Home Page
head Mesothelioma: An Overview
kleio The Clock Is Ticking
asbestos Our Toughest Cases
head Diagnosis
treatment Symptoms, Stages, Treatment
kleio Latest News
New York Numbers
Asbestos
Real Stories


IN THIS SECTION
HEPA Vacuum


RETURN BACK TO
Mesothelioma
Mesothelioma Resource Center
Asbestos
Asbestos Exposure Dangers
Asbestos Help
News & Warnings
Guidelines
Asbestos Standards

Mesothelioma Lawyer

Asbestos Lawyer

Mesothelioma Attorney

Asbestos Attorney

For legal help anywhere in the U.S. call:

1 - 800 - 476 - 6070

Prior results do not guarantee a similar outcome.

ATTORNEY ADVERTISING

see also:

HEPA Vacuum To properly remove asbestos you will need a HEPA vacuum
HEPA filtered vacuums help safely remove asbestos from a site

Negative Pressure Asbestos site - Make sure there is negative pressure
Establishing negative pressure is important when removing asbestos

Asbestos Standards Asbestos Operations: Work Practices and Engineering Controls
Engineering Controls and Work Practices Regarding Asbestos