OSHA: Information to Include in the Planning of an Asbestos System
The following information should be included in the planning of the system:
A physical description of the work area;
A description of the approximate amount of material to be removed;
A schedule for turning off and sealing existing ventilation systems;
Personnel hygiene procedures;
A description of personal protective equipment and clothing to be worn by employees;
A description of the local exhaust ventilation systems to be used and how they are to be tested;
A description of work practices to be observed by employees;
An air monitoring plan;
A description of the method to be used to transport waste material; and The location of the dump site.
Courtesy of OSHA
Asbestos site - Make sure there is negative pressure