The Story Of Our Firm | En Français | En Español
 Home    Lawyers   Litigation   Contact Us   Verdicts   Search

Personal Injury Construction Research Center News & Warnings OSHA Guidelines

Forging machines

in this section: Definitions | General | Woodworking | Abrasive wheel machinery | Rubber/Plastic Mills | Mechanical power presses | Forging machines | Mechanical power-transmission


Bookmark This Page Print This Page Email This Page

Occupational Safety and Health Standards: Machinery and Machine Guarding, Forging machines.

If you are the victim of construction accidents, use this page to conduct research. To have your case evaluated immediately, please fill out our form. Read more about the Occupational Safety and Health Standards, 1910.218, Machinery and Machine Guarding, Forging machines..

1910.218(a)

General requirements -

1910.218(a)(1)

Use of lead. The safety requirements of this subparagraph apply to lead casts or other use of lead in the forge shop or die shop.

1910.218(a)(1)(i)

Thermostatic control of heating elements shall be provided to maintain proper melting temperature and prevent overheating.

1910.218(a)(1)(ii)

Fixed or permanent lead pot installations shall be exhausted.

1910.218(a)(1)(iii)

Portable units shall be used only in areas where good, general room ventilation is provided.

1910.218(a)(1)(iv)

Personal protective equipment (gloves, goggles, aprons, and other items) shall be worn.

1910.218(a)(1)(v)

A covered container shall be provided to store dross skimmings.

1910.218(a)(1)(vi)

Equipment shall be kept clean, particularly from accumulations of yellow lead oxide.

..1910.218(a)(2)

1910.218(a)(2)

Inspection and maintenance. It shall be the responsibility of the employer to maintain all forge shop equipment in a condition which will insure continued safe operation. This responsibility includes:

1910.218(a)(2)(i)

Establishing periodic and regular maintenance safety checks and keeping certification records of these inspections which include the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier, for the forging machine which was inspected.

1910.218(a)(2)(ii)

Scheduling and recording the inspection of guards and point of operation protection devices at frequent and regular intervals. Recording of inspections shall be in the form of a certification record which includes the date the inspection was performed, the signature of the person who performed the inspection and the serial number, or other identifier, of the equipment inspected.

1910.218(a)(2)(iii)

Training personnel for the proper inspection and maintenance of forging machinery and equipment.

1910.218(a)(2)(iv)

All overhead parts shall be fastened or protected in such a manner that they will not fly off or fall in event of failure.

..1910.218(a)(3)

1910.218(a)(3)

Hammers and presses.

1910.218(a)(3)(i)

All hammers shall be positioned or installed in such a manner that they remain on or are anchored to foundations sufficient to support them according to applicable engineering standards.

1910.218(a)(3)(ii)

All presses shall be installed in such a manner that they remain where they are positioned or they are anchored to foundations sufficient to support them according to applicable engineering standards.

TABLE O-11 - STRENGTH AND DIMENSIONS FOR WOOD RAM PROPS

_____________________________________________________________________

| | | | | |

Size of |Square |Minimum | Maximum |Safety| Maximum |Maximum

timber, |inches |allowable | static |factor| recommended |allowable

inches(1)| in |crushing | load | | weight of |length of

| cross |strength | within | | forging | timber,

|section|parallel | short | | hammer for | inches

| |to grain, | column | | timber used |

| |p.s.i.(2) | range(3)| | |

_________|_______|__________|_________|______|_____________|_________

| | | | | |

4 X 4 | 16 | 5,000 | 80,000 | 10 | 8,000 | 44

6 X 6 | 36 | 5,000 | 180,000 | 10 | 18,000 | 66

8 X 8 | 64 | 5,000 | 320,000 | 10 | 32,000 | 88

10 X 10 | 100 | 5,000 | 500,000 | 10 | 50,000 | 100

12 X 12 | 144 | 5,000 | 720,000 | 10 | 72,000 | 132

_________|_______|__________|_________|______|_____________|_________

Footnote(1) Actual dimension.

Footnote(2) Adapted from U.S. Department of Agriculture Technical

Bulletin 479. Hardwoods recommended are those whose ultimate crushing

strengths in compression parallel to grain are 5,000 p.s.i. (pounds

per square inch) or greater.

Footnote(3) Slenderness ratio formula for short columns is L/d=11,

where L=length of timber in inches and d=least dimension in inches;

this ratio should not exceed 11.

1910.218(a)(3)(iii)

Means shall be provided for disconnecting the power to the machine and for locking out or rendering cycling controls inoperable.

1910.218(a)(3)(iv)

The ram shall be blocked when dies are being changed or other work is being done on the hammer. Blocks or wedges shall be made of material the strength and construction of which should meet or exceed the specifications and dimensions shown in Table O-11.

1910.218(a)(3)(v)

Tongs shall be of sufficient length to clear the body of the worker in case of kickback, and shall not have sharp handle ends.

1910.218(a)(3)(vi)

Oil swabs, or scale removers, or other devices to remove scale shall be provided. These devices shall be long enough to enable a man to reach the full length of the die without placing his hand or arm between the dies.

1910.218(a)(3)(vii)

Material handling equipment shall be of adequate strength, size, and dimension to handle diesetting operations safely.

..1910.218(a)(3)(viii)

1910.218(a)(3)(viii)

A scale guard of substantial construction shall be provided at the back of every hammer, so arranged as to stop flying scale.

1910.218(a)(3)(ix)

A scale guard of substantial construction shall be provided at the back of every press, so arranged as to stop flying scale.

1910.218(b)

Hammers, general -

1910.218(b)(1)

Keys. Die keys and shims shall be made from a grade of material that will not unduly crack or splinter.

1910.218(b)(2)

Foot operated devices. All foot operated devices (i.e., treadles, pedals, bars, valves, and switches) shall be substantially and effectively protected from unintended operation.

1910.218(c)

Presses. All manually operated valves and switches shall be clearly identified and readily accessible.

1910.218(d)

Power-driven hammers -

1910.218(d)(1)

Safety cylinder head. Every steam or airhammer shall have a safety cylinder head to act as a cushion if the rod should break or pullout of the ram.

..1910.218(d)(2)

1910.218(d)(2)

Shutoff valve. Steam hammers shall be provided with a quick closing emergency valve in the admission pipeline at a convenient location. This valve shall be closed and locked in the off position while the hammer is being adjusted, repaired, or serviced, or when the dies are being changed.

1910.218(d)(3)

Cylinder draining. Steam hammers shall be provided with a means of cylinder draining, such as a self-draining arrangement or a quick-acting drain cock.

1910.218(d)(4)

Pressure pipes. Steam or air piping shall conform to the specifications of American National Standard ANSI B31.1.0-1967, Power Piping with Addenda issued before April 28, 1971, which is incorporated by reference as specified in Sec. 1910.6.

1910.218(e)

Gravity hammers -

1910.218(e)(1)

Air-lift hammers.

1910.218(e)(1)(i)

Air-lift hammers shall have a safety cylinder head as required in paragraph (d)(1) of this section.

1910.218(e)(1)(ii)

Air-lift hammers shall have an air shutoff valve as required in paragraph (d)(2) of this section.

1910.218(e)(1)(iii)

Air-lift hammers shall be provided with two drain cocks: one on main head cylinder, and one on clamp cylinder.

..1910.218(e)(1)(iv)

1910.218(e)(1)(iv)

Air piping shall conform to the specifications of the ANSI B31.1.0-1967, Power Piping with Addenda issued before April 28, 1971, which is incorporated by reference as specified in Sec. 1910.6.

1910.218(e)(2)

Board drophammers.

1910.218(e)(2)(i)

A suitable enclosure shall be provided to prevent damaged or detached boards from falling. The board enclosure shall be securely fastened to the hammer.

1910.218(e)(2)(ii)

All major assemblies and fittings which can loosen and fall shall be properly secured in place.

1910.218(f)

Forging presses -

1910.218(f)(1)

Mechanical forging presses. When dies are being changed or maintenance is being performed on the press, the following shall be accomplished:

1910.218(f)(1)(i)

The power to the press shall be locked out.

1910.218(f)(1)(ii)

The flywheel shall be at rest.

1910.218(f)(1)(iii)

The ram shall be blocked with a material the strength of which shall meet or exceed the specifications or dimensions shown in Table O-11.

1910.218(f)(2)

Hydraulic forging presses. When dies are being changed or maintenance is being performed on the press, the following shall be accomplished:

..1910.218(f)(2)(i)

1910.218(f)(2)(i)

The hydraulic pumps and power apparatus shall be locked out.

1910.218(f)(2)(ii)

The ram shall be blocked with a material the strength of which shall meet or exceed the specifications or dimensions shown in Table O-11.

1910.218(g)

Trimming presses -

1910.218(g)(1)

Hot trimming presses. The requirements of paragraph (f)(1) of this section shall also apply to hot trimming presses.

1910.218(g)(2)

Cold trimming presses. Cold trimming presses shall be safeguarded in accordance with 1910.217(c).

1910.218(h)

Upsetters -

1910.218(h)(1)

General requirements. All upsetters shall be installed so that they remain on their supporting foundations.

1910.218(h)(2)

Lockouts. Upsetters shall be provided with a means for locking out the power at its entry point to the machine and rendering its cycling controls inoperable.

1910.218(h)(3)

Manually operated controls. All manually operated valves and switches shall be clearly identified and readily accessible.

..1910.218(h)(4)

1910.218(h)(4)

Tongs. Tongs shall be of sufficient length to clear the body of the worker in case of kickback, and shall not have sharp handle ends.

1910.218(h)(5)

Changing dies. When dies are being changed, maintenance performed, or any work done on the machine, the power to the upsetter shall be locked out, and the flywheel shall be at rest.

1910.218(i)

Other forging equipment -

1910.218(i)(1)

Boltheading. The provisions of paragraph (h) of this section shall apply to boltheading.

1910.218(i)(2)

Rivet making. The provisions of paragraph (h) of this section shall apply to rivet making.

1910.218(j)

Other forge facility equipment-

1910.218(j)(1)

Billet shears. A positive-type lockout device for disconnecting the power to the shear shall be provided.

1910.218(j)(2)

Saws. Every saw shall be provided with a guard of not less than one-eighth inch sheet metal positioned to stop flying sparks.

1910.218(j)(3)

Conveyors. Conveyor power transmission equipment shall be guarded in accordance with ANSI B20.1-1957, Safety Code for Conveyors, Cableways, and Related Equipment, which is incorporated by reference as specified in Sec. 1910.6.

..1910.218(j)(4)

1910.218(j)(4)

Shot blast. The cleaning chamber shall have doors or guards to protect operators.

1910.218(j)(5)

Grinding. Personal protective equipment shall be used in grinding operations, and equipment shall be used and maintained in accordance with ANSI B7.1-1970, Safety Code for the Use, Care, and Protection of Abrasive Wheels, which is incorporated by reference as specified in Sec. 1910.6, and with 1910.215.

[39 FR 23502, June 27, 1974, as amended at 49 FR 5323, Feb. 10, 1984; 51 FR 34561, Sept. 29, 1986; 61 FR 9227, March 7, 1996]

Act now! It is essential that you inquire about your case as soon as possible. Litigation may be the only way to receive the damages to which you may be entitled, such as medical and health care bills, lost or diminished wages, and financial compensation to family in the case of death. Your individual state's law may limit your time to bring a legal claim to protect your rights. You need to have your construction accidents claim evaluated immediately!

Click To Talk To Us Online

Please complete the following questionnaire:

Name
Email
Phone Number
Best time to call
City/State
Please describe the circumstances of the construction accident
Please describe your injury
How did you hear about Weitz & Luxenberg?
Additional comments
Are you experiencing health problems related to this work?


see also:

Definitions FREE construction accidents OSHA information: Definitions.
construction accidents info: Machinery and Machine Guarding, Definitions.

Rubber/Plastic Mills FREE construction accidents OSHA information: Mills and calenders in the rubber and plastics industries.
construction accidents info: Machinery and Machine Guarding, Mills and calenders in the rubber and plastics industries.

Authority for 1910 Subpart O FREE construction accidents OSHA information: Authority for 1910 Subpart O
construction accidents info: Machinery and Machine Guarding, Authority for 1910 Subpart O

Name
Phone
Email
Do you have a legal question? Ask us!    strictly confidential
Your Question
  • MESOTHELIOMA
    • Mesothelioma Treatment
    • Mesothelioma Symptoms
    • Lung Cancer
    • Help for Veterans
    • Asbestos Exposure
    • Your Legal Options
    • Mesothelioma Lawyer
    • Asbestos Cancer
  • DEFECTIVE MEDICINES AND DEVICES
      Actos
      DePuy Hip
      Fosamax
    • Accutane
    • Avandia
    • Depakote
    • Gadolinium
    • Hydroxycut
    • Paxil Birth Defects
    • Qui Tam
    • Reglan
    • Shoulder Pain Pumps
    • Topamax
    • Pelvic Mesh
    • Yaz/Yasmin/Ocella
    • Zimmer Durom
    • Zimmer NexGen-CR Flex Porous Femoral component
    • Zimmer LPS-Flex
    • Zoloft Birth Defects
  • ENTERTAINMENT LAW
    • Intellectual Property
    • Creative Rights
    • Royalties
    • Licensing Fees
    • Breach of Contract
    • Fraud
  • ENVIRONMENTAL POLLUTION
    • Arsenic
    • Benzene
    • Chromium
    • Dioxins
    • Gulf Oil Spill
    • Landfill Odors
    • Lead Poisoning
    • Mercury Poisoning
    • Pesticides
    • Petroleum Spills
    • PCB
    • Property Damage
    • Radium
    • TCE
    • Water Contamination
    • Vapor Intrusion
  • ACCIDENTS
    • Auto Accident
    • Car Accident
    • Elevator Accident
    • Truck Accident
    • Workplace Accident
    • Pedestrian Knock-down
    • Bicyclist Collision
    • Motorcycle Collision
    • Single-Car Collision
    • Toyota Recall
    • Two-Car Collision
    • Multi-Car Collision
  • PERSONAL INJURY
    • Aviation
    • Back Injury
    • Birth Defects
    • Burn Injury
    • Brain Injury
    • Eye Injury
    • Life Insurance Law
    • Nursing Home Abuse
    • Spinal Cord Injury
    • Wrongful Death
    • Product Liability
    • Assault
    • Battery
    • Dog Bite
    • Stray Electricity
  • MEDICAL MALPRACTICE
    • New York Medical Malpractice
    • Anesthesia Complications
    • Birth Injury
    • Brachial Plexus Palsy
    • Cancer Misdiagnosis
    • Cerebral Palsy
    • Death
    • Erb’s Palsy
    • Failure to Diagnose
    • Foreign Object
    • Hospital Error
    • Hydrocephalus
    • Informed Consent
    • Medication Error
    • Pain and Suffering
    • Paraplegia
    • Podiatric Malpractice
    • Quadriplegia
    • Surgical Error
Name:
Phone:
Email:
Case Description:


$423 million settlement
MTBE suit involving the contamination of 153 public water systems nationally
$16.5 million verdict
Asbestos case involving exposure from dental tape
$1.4 million settlement
Accident involving woman struck down by ambulance
$1.5 million settlement
for 47-year-old construction worker who fell off elevated train tracks
$6 million settlement
Pediatric malpractice involving infant who suffered brain damage at birth
$53 million verdict
brake mechanic suffering from mesothelioma
$13.5 million verdict
one of the very first Vioxx trial cases
$15 million settlement
man wound up a paraplegic due to negligent hospital care
$37 million verdict
2 asbestos lung cancer plaintiffs
$47 million verdict
boilermaker who died from mesothelioma
$2.6 million settlement
ill-fitting prosthesis caused decubitus ulcers
$75 million verdict
historic consolidated trial involving men who had worked at the Brooklyn Navy Yard in the 1940s and 1950s
$8 million settlement
obstetrical malpractice resulted in neurological deficits
$64.65 million award
4 asbestos plaintiffs
$17.5 million
consolidated trial of 5 mesothelioma victims
Ask a Free Question:
Were you injured?
check for your response [login]
For legal help anywhere in the U.S.
A nationally-recognized personal injury law firm, Weitz & Luxenberg is committed to helping clients win cases,

get the compensation to which they’re entitled and continue with their lives. In just over 25 years, we’ve collected more than $7 billion for plaintiffs.

Copyright © 2012 Weitz & Luxenberg, 700 Broadway, New York, NY 10003

Wi3 Prior results do not guarantee a similar outcome.
HOME | DISCLAIMER | SITE MAP | CONTACT US |NEWS CENTER | CAREERS